
great for the framing stage
“putting up a new building and needed temp lighting before the electrical is fully roughed in. strung a line of these around the ceiling grid right above the concrete half walls. linking them together was super fast. throws plenty of light down to the gravel floor so i can park the tractor inside at night without hitting the stacks of lumber.”










